Abstrakt
The existing municipal water supply systems are composed mainly of excessively reserved water supply infrastructure i.e. systems with significant excess capacity in relation to the actual demand. Considering management challenges regarding the oversized water supply infrastructure, the authors propose reliability-economic methodology in the example of the existing water treatment plant. Two-parameter analytical method was used for reliability analysis while the economic aspect was presented using the Life Cycle Costing (LCC). The basis for the proposed methodology was an analysis of the proprietary indicators, i.e. economical operational readiness rate (Re), indicator of consequences of operational decisions (Ic) as well as the unit indicator of consequences of operational decisions (Iuc) in selected operational variants of the water supply system. Due to the structural complexity of the water treatment plant, a new approach to the management of excessively reserved water supply infrastructure in the example of the two parallel rapid filtration systems was proposed. The presented reliability-economic approach to the oversized infrastructure management allows for characterization of further operational scenarios and selection of the most favorable one. Presented analysis results led to development of a rational management plan for technical infrastructure of water filtration arrangements in the water supply system.
| Przetłumaczony tytuł wkładu | Application of integrated reliability-economic analysis in management of oversized water supply infrastructure |
|---|---|
| Język oryginału | polski |
| Strony (od–do) | 25-30 |
| Liczba stron | 6 |
| Czasopismo | Ochrona Srodowiska |
| Tom | 37 |
| Numer wydania | 4 |
| Status publikacji | Opublikowano - 2015 |
Cele SDG ONZ
Ten wynik przyczynia się do realizacji następujących celów zrównoważonego rozwoju
-
Cel 6 Czysta woda i higiena
-
Cel 9 Przemysł, innowacje i infrastruktura
-
Cel 11 Zrównoważone miasta i społeczności
Słowa kluczowe
- Excessively reserved (oversized) system
- Life Cycle Costing (LCC)
- Reliability
- Water supply system
Obszary tematyczne ASJC Scopus
- Ogólne nauki o środowisku
Fingerprint
Zanurz się w tematy badawcze publikacji „Zastosowanie zintegrowanej metody analizy niezawodnos̈ciowo-ekonomicznej w zarządzaniu przewymiarowaną infrastrukturą wodociągową”. Razem tworzą niepowtarzalny odcisk palca.Cytowanie
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver