Abstrakt
Aspects of using the small-scale combined heat and power modules in buildings is presented in this paper. At first the problems of energy demand analysis, which is the key point of a co-generation plant sizing procedure, are discused. Then the demonstration project of a small-scale co-generation plant is presented. The plant is fuelled with natural gas, and it supplies energy to a group of three different buildings. Basing on this case, the problems of optimal sizing of a small-scale CHP plant for a building energy supply system are presented and discussed. Calculation procedures are shown together with the results of sample analysis. The factors influencing the final configuration of the system are indicated.
| Język oryginału | angielski |
|---|---|
| Strony (od–do) | 5-13 |
| Liczba stron | 9 |
| Czasopismo | Journal of Civil Engineering and Management |
| Tom | 12 |
| Numer wydania | 1 |
| Identyfikatory DOI | |
| Status publikacji | Opublikowano - mar 2006 |
Obszary tematyczne ASJC Scopus
- Inżynieria lądowa i strukturalna
- Strategia i zarządzanie
Fingerprint
Zanurz się w tematy badawcze publikacji „Small-scale co-generation for building applications - Nergy demand analysis at demonstration site and optimal sizing of the chp plant”. Razem tworzą niepowtarzalny odcisk palca.Cytowanie
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver