The article presents a process of deflection eliminating (rectification) a vertically deflected 11-storey residential building consisting of two segments. Rectification consisted of tearing the building at the level where the prefabricated construction was resting on the monolithic foundation ribs and then of lifting the part of the building situated too low. The building corner situated lowest was raised by 572 mm. Rectification, carried out by means of 50 membrane jacks, restored the building's full functionality. The article presents also results of numerical investigations. Investigations were performed for two possible schema of the floors' work.
| Język oryginału | angielski |
|---|---|
| Strony (od–do) | 382-391 |
| Liczba stron | 10 |
| Czasopismo | Procedia Engineering |
| Tom | 57 |
| Identyfikatory DOI | |
| Status publikacji | Opublikowano - 2013 |
| Wydarzenie | 11th International Scientific Conference on Modern Building Materials, Structures and Techniques, MBMST 2013 - Vilnius, Litwa Czas trwania: 16 maj 2013 → 17 maj 2013 |
Obszary tematyczne ASJC Scopus
- Inżynieria ogólna
Fingerprint
Zanurz się w tematy badawcze publikacji „Rectification an 11-storey vertically deflected residential building”. Razem tworzą niepowtarzalny odcisk palca.Cytowanie
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver