Abstrakt
In this paper an average number of re-handlings analysis is proposed to solve the problem of finding bays configuration in small container terminal in Gliwice, Poland. Rehandlings in this terminal can be performed only by reachstackers. The goal of the heuristic is to plan the reachstacter moves in the terminal, assuming that the target containers are reached and the number of re-handings is minimized. The real situation requires also to take into account the model of the problem environment uncertainty caused by the fact that many containers are not delivered to the terminal on time, or can not be sent on scheduled time. To enable this, the heuristic uses some assumptions to simplify problem analysis.
| Język oryginału | angielski |
|---|---|
| Strony (od–do) | 673-676 |
| Liczba stron | 4 |
| Czasopismo | World Academy of Science, Engineering and Technology |
| Tom | 46 |
| Status publikacji | Opublikowano - 2010 |
Obszary tematyczne ASJC Scopus
- Inżynieria ogólna
Fingerprint
Zanurz się w tematy badawcze publikacji „Re-handling operations in small container terminal operated by reach stackers”. Razem tworzą niepowtarzalny odcisk palca.Cytowanie
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver