Abstrakt
The paper describes a procedure that allows to start up a steam turbine in a significantly shorter period. The procedure is developed for start-ups that begin from a cold state, when the temperature of the parts of the turbine is close to the ambient temperature. The pre-heating rises the parts temperature before the actual start-up begins. It changes the thermal state of the turbine and causes smaller maximal stress during the initial period of the start-up. The procedure involves a pre-heating of the turbine with a hot air generated in an electric heater. The paper describes the requirements of the process. It presents the possible configurations of the flow in the turbine and the analysis of the thermal and the strength state of the turbine during the pre-heating.
| Język oryginału | angielski |
|---|---|
| Numer artykułu | 01024 |
| Czasopismo | E3S Web of Conferences |
| Tom | 137 |
| Identyfikatory DOI | |
| Status publikacji | Opublikowano - 16 gru 2019 |
| Wydarzenie | 14th Research and Development in Power Engineering, RDPE 2019 - Warsaw, Polska Czas trwania: 3 gru 2019 → 6 gru 2019 |
Obszary tematyczne ASJC Scopus
- Ogólne nauki o środowisku
- Energia ogólna
- Ogólne nauki o Ziemi i planetach
Fingerprint
Zanurz się w tematy badawcze publikacji „Preheating procedure for fast start-up of a steam turbine from a cold state”. Razem tworzą niepowtarzalny odcisk palca.Cytowanie
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver