Przeskocz do nawigacji głównej Przeskocz do wyszukiwania Przeskocz do głównej treści

Off-design operation of the multi-fuel CHP cycles

Wyniki badań: Wkład w konferencjęArtykułrecenzja

Abstrakt

The paper describes the problems when the operation regime of the CI-IP cycle is adjusted according to the user demands. The analysis concerns a multi-fuel system, which utilizes biomass, natural gas and coal. The analyzed system consists of a combined gas and steam cycles. The analysis presented here concerns off-design operation caused by part loading, varying ambient conditions and power demands. An appropriate division of the load between the sub-cycles increases the overall efficiency. The analysis concerns also various options of biomass supply to the system. The research regards mostly the effectiveness criterion as it has a direct influence on the costs of operation.

Język oryginałuangielski
Strony169-178
Liczba stron10
Identyfikatory DOI
Status publikacjiOpublikowano - 2008
Wydarzenie2008 ASME Turbo Expo - Berlin, Niemcy
Czas trwania: 9 cze 200813 cze 2008

Konferencja

Konferencja2008 ASME Turbo Expo
Kraj/TerytoriumNiemcy
MiejscowośćBerlin
Okres9/06/0813/06/08

Obszary tematyczne ASJC Scopus

  • Inżynieria ogólna

Fingerprint

Zanurz się w tematy badawcze publikacji „Off-design operation of the multi-fuel CHP cycles”. Razem tworzą niepowtarzalny odcisk palca.

Cytuj to