Abstrakt
A method for production planning in a repetitive manufacturing system which allows for estimating the possibility of processing work orders in due time is presented. The difference between two approaches are presented; the first one one-piece flow elaborated in Toyota and the second one elaborated by authors that consists in defining sufficient conditions to filter all solutions and providing a set of admissible solutions for both the client and the producer. In the paper attention is focused on the buffer allocation. Illustrative examples are presented..
| Język oryginału | angielski |
|---|---|
| Numer artykułu | 012133 |
| Czasopismo | IOP Conference Series: Materials Science and Engineering |
| Tom | 95 |
| Numer wydania | 1 |
| Identyfikatory DOI | |
| Status publikacji | Opublikowano - 3 lis 2015 |
| Wydarzenie | 3rd Modern Technologies in Industrial Engineering, ModTech 2015 - Mamaia, Rumunia Czas trwania: 17 cze 2015 → 20 cze 2015 |
Cele SDG ONZ
Ten wynik przyczynia się do realizacji następujących celów zrównoważonego rozwoju
-
Cel 9 Przemysł, innowacje i infrastruktura
Obszary tematyczne ASJC Scopus
- Materiałoznawstwo ogólne
- Inżynieria ogólna
Fingerprint
Zanurz się w tematy badawcze publikacji „Multi-assortment rhythmic production planning and control”. Razem tworzą niepowtarzalny odcisk palca.Cytowanie
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver