Abstrakt
The railway viaduct WK-3 built using crosswise launching technology under the task .,Trasa GóRNA" in Łódź. Testing program was prepared in two stages due to the railway line closure for 68 hours. Due to it, rigidity of the load carrying structures could have been controlled at selected stages of the construction. Load tests made us evaluate theoretical computational model and confirm design capacity.
| Język oryginału | angielski |
|---|---|
| Strony (od–do) | 530-537 |
| Liczba stron | 8 |
| Czasopismo | Procedia Engineering |
| Tom | 161 |
| Identyfikatory DOI | |
| Status publikacji | Opublikowano - 2016 |
| Wydarzenie | World Multidisciplinary Civil Engineering-Architecture-Urban Planning Symposium, WMCAUS 2016 - Prague, Republika Czeska Czas trwania: 13 cze 2016 → 17 cze 2016 |
Obszary tematyczne ASJC Scopus
- Inżynieria ogólna
Fingerprint
Zanurz się w tematy badawcze publikacji „Load Test of Railway Viaduct Built Using Crosswise Launching Technology”. Razem tworzą niepowtarzalny odcisk palca.Cytowanie
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver