N2 - In the process of multiassortment repetitive production planning the designation of operating system parameters for the steady state (in which after the last operation the return to the first operation in the sequence of productive resources occurs) is required. The length of steady state of the system is determined by the work of the critical resource. Determination of resources sequence for the steady state gives possibility to determine the processing times for processes in the system without taking into account the transitional phases. During the execution of this type of production, in addition to the phase in which production takes place in the steady state, transition phases connected with starting (start-up phase) and finishing work in the system (cease phase), and the phases associated with the changes in ongoing sequences in steady states can be distinguished. The article presents the problem of estimating the duration of the start-up phase and the cease phase in the concurrent multiassortment production systems, in which access to the resources is regulated by the local dispatching rules. A method and a procedure of creating a schedule for the transition phases using the integration between the systems of production planning and scheduling is presented. The demonstrated approach is illustrated with the examples using KbRS and SWZ systems.
AB - In the process of multiassortment repetitive production planning the designation of operating system parameters for the steady state (in which after the last operation the return to the first operation in the sequence of productive resources occurs) is required. The length of steady state of the system is determined by the work of the critical resource. Determination of resources sequence for the steady state gives possibility to determine the processing times for processes in the system without taking into account the transitional phases. During the execution of this type of production, in addition to the phase in which production takes place in the steady state, transition phases connected with starting (start-up phase) and finishing work in the system (cease phase), and the phases associated with the changes in ongoing sequences in steady states can be distinguished. The article presents the problem of estimating the duration of the start-up phase and the cease phase in the concurrent multiassortment production systems, in which access to the resources is regulated by the local dispatching rules. A method and a procedure of creating a schedule for the transition phases using the integration between the systems of production planning and scheduling is presented. The demonstrated approach is illustrated with the examples using KbRS and SWZ systems.
KW - Production planning
KW - constraint satisfaction
KW - integration
KW - scheduling
KW - xml
UR - https://www.scopus.com/pages/publications/84858853805
U2 - 10.1007/978-3-642-28931-6_27
DO - 10.1007/978-3-642-28931-6_27
M3 - Conference contribution
AN - SCOPUS:84858853805
SN - 9783642289309
T3 - Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics)
SP - 274
EP - 283
BT - Hybrid Artificial Intelligent Systems - 7th International Conference, HAIS 2012, Proceedings
T2 - 7th International Conference on Hybrid Artificial Intelligent Systems, HAIS 2012
Y2 - 28 March 2012 through 30 March 2012
ER -