Abstrakt
ETL processes are sometimes interrupted by occurrence of failure. After that, one of the interrupted extraction resumption algorithms is usually used. In this paper we present a modified Design-Resume algorithm (Redo group) enriched by the possibility of handling ETL processes containing many loading nodes. The key feature of this algorithm is that it does not impose additional overhead on normal ETL process. Extending the resumption time in some situations is the drawback of the presented Design-Resume resumption. To solve this problem we present an estimation method predicting the resumption time which is the modification of the method implemented in our previous DR/JB extraction environment. This let us decide what action should be taken: resumption or running the extraction from the beginning. The accuracy of the estimation is examined in the paper, then the estimation algorithm's drawbacks are discussed and factors making estimation imprecise are enumerated. Finally, we summarize obtained results and show our future plans.
| Język oryginału | angielski |
|---|---|
| Strony | 284-292 |
| Liczba stron | 9 |
| Status publikacji | Opublikowano - 2004 |
| Wydarzenie | 15th International Conference on Systems Science - Wroclaw, Polska Czas trwania: 7 wrz 2004 → 10 wrz 2004 |
Konferencja
| Konferencja | 15th International Conference on Systems Science |
|---|---|
| Kraj/Terytorium | Polska |
| Miejscowość | Wroclaw |
| Okres | 7/09/04 → 10/09/04 |
Obszary tematyczne ASJC Scopus
- Inżynieria ogólna
Fingerprint
Zanurz się w tematy badawcze publikacji „Estimation of profitability of Design-Resume/JavaBeans resumption algorithm”. Razem tworzą niepowtarzalny odcisk palca.Cytowanie
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver