Abstrakt
A queuing system of the M/M/1/N type with cyclic failure-free and repair times and cyclic defective production is used as a model of a single machine production system. Production tasks arrive according to an exponential process and are served with normally disturbed processing time. Successive working (failure-free) times, repair times and defect-free production have exponential distributions. Defective products can be recirculated and back to the production line according to a Bernoulli distributions. The objective is to evaluate effectiveness of the production system using Overall Equipment Effectiveness before and after introducing improvement initiatives..
| Język oryginału | angielski |
|---|---|
| Numer artykułu | 012155 |
| Czasopismo | IOP Conference Series: Materials Science and Engineering |
| Tom | 95 |
| Numer wydania | 1 |
| Identyfikatory DOI | |
| Status publikacji | Opublikowano - 3 lis 2015 |
| Wydarzenie | 3rd Modern Technologies in Industrial Engineering, ModTech 2015 - Mamaia, Rumunia Czas trwania: 17 cze 2015 → 20 cze 2015 |
Obszary tematyczne ASJC Scopus
- Materiałoznawstwo ogólne
- Inżynieria ogólna
Fingerprint
Zanurz się w tematy badawcze publikacji „Estimation of overall equipment effectiveness using simulation programme”. Razem tworzą niepowtarzalny odcisk palca.Cytowanie
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver