A queuing system of the M/M/1/N type with cyclic failure-free and repair times and cyclic defective production is used as a model of a single machine production system. Production tasks arrive according to an exponential process and are served with normally disturbed processing time. Successive working (failure-free) times, repair times and defect-free production have exponential distributions. Defective products can be recirculated and back to the production line according to a Bernoulli distributions. The objective is to evaluate effectiveness of the production system using Overall Equipment Effectiveness before and after introducing improvement initiatives..

Język oryginałuangielski
Numer artykułu012155
CzasopismoIOP Conference Series: Materials Science and Engineering
Tom95
Numer wydania1
Identyfikatory DOI
Status publikacjiOpublikowano - 3 lis 2015
Wydarzenie3rd Modern Technologies in Industrial Engineering, ModTech 2015 - Mamaia, Rumunia
Czas trwania: 17 cze 2015 → 20 cze 2015

Obszary tematyczne ASJC Scopus

  • Materiałoznawstwo ogólne
  • Inżynieria ogólna

Fingerprint

Zanurz się w tematy badawcze publikacji „Estimation of overall equipment effectiveness using simulation programme”. Razem tworzą niepowtarzalny odcisk palca.

Cytowanie