In this paper five-bus test system as well as Polish power system consisting of 2750 nodes and 3500 branches have been used for calculations. For each case LMP values were determined by three methods: AC OPF with direct respecting voltage constraints, DCL OPF with power losses and DC OPF-withoutpower losses. Based on the results obtained, it can be concluded that the proposed method for determining the branch real power capacity limit it possible to meet voltage constraints in the network during DC optimization. It can also be stated that in the Polish power system it is possible apply both the exact AC model and a simplified DCL model, while the use of the DC model is not appropriate for the Polish system.

Język oryginałuangielski
Tytuł publikacji goszczącej2005 CIGRE/IEEE PES International Symposium
Strony61-68
Liczba stron8
Identyfikatory DOI
Status publikacjiOpublikowano - 2005
Wydarzenie2005 CIGRE/IEEE PES International Symposium - New Orleans, LA, Stany Zjednoczone
Czas trwania: 5 paź 20057 paź 2005

Seria publikacji

Nazwa2005 CIGRE/IEEE PES International Symposium

Konferencja

Konferencja2005 CIGRE/IEEE PES International Symposium
Kraj/TerytoriumStany Zjednoczone
MiejscowośćNew Orleans, LA
Okres5/10/057/10/05

Obszary tematyczne ASJC Scopus

  • Inżynieria ogólna

Fingerprint

Zanurz się w tematy badawcze publikacji „AC or DC OPF based LMP's in a competitive electricity market?”. Razem tworzą niepowtarzalny odcisk palca.

Cytowanie