TY - GEN
T1 - A production scheduling model with maintenance
AU - Paprocka, Iwona
AU - Kempa, Wojciech M.
AU - Kalinowski, Krzysztof
AU - Grabowik, Cezary
N1 - Publisher Copyright:
© (2014) Trans Tech Publications, Switzerland.
PY - 2014
Y1 - 2014
N2 - In the paper, a production model with maintenance is presented. Successive failure-free times of a bottleneck are supposed to have predefined distributions and are followed by distributed times of repair. Having values of parameters: mean time to failure and mean time of repair, a predictive schedule is generated. To assess wastes due to unplanned events of the bottleneck, such as unplanned downtime the overall equipment effectiveness indicator is applied. To assess failure rate of the bottleneck the parts per million opportunities indicator is applied. Prediction capability, detection capability of a failure and effects of the failure occurrence are evaluated and registered in the exploitation failure mode and effects analysis form. The objective of the presented predictive scheduling model is to achieve: zero machine’s failures, zero defects, zero accidents at work.
AB - In the paper, a production model with maintenance is presented. Successive failure-free times of a bottleneck are supposed to have predefined distributions and are followed by distributed times of repair. Having values of parameters: mean time to failure and mean time of repair, a predictive schedule is generated. To assess wastes due to unplanned events of the bottleneck, such as unplanned downtime the overall equipment effectiveness indicator is applied. To assess failure rate of the bottleneck the parts per million opportunities indicator is applied. Prediction capability, detection capability of a failure and effects of the failure occurrence are evaluated and registered in the exploitation failure mode and effects analysis form. The objective of the presented predictive scheduling model is to achieve: zero machine’s failures, zero defects, zero accidents at work.
KW - Failure mode and effects analysis
KW - Maintenance scheduling
KW - Mean time to failure
KW - Overall equipment effectiveness
KW - Predictive scheduling
KW - Reliability function
UR - https://www.scopus.com/pages/publications/84922388267
U2 - 10.4028/www.scientific.net/AMR.1036.885
DO - 10.4028/www.scientific.net/AMR.1036.885
M3 - Conference contribution
AN - SCOPUS:84922388267
T3 - Advanced Materials Research
SP - 885
EP - 890
BT - Modern Technologies in Industrial Engineering II
A2 - Mikhaylov, Alexander
A2 - Nedelcu, Dumitru
A2 - Toca, Alexei
A2 - Wrobel, Andrzej
A2 - Carausu, Constantin
A2 - Oanta, Emil
PB - Trans Tech Publications Ltd.
ER -