Abstract
Integration of renewable and waste energy sources, decentralisation, electrification and energy storage, are key pillars of energy transition in the district heating sector. Such a strategy can be implemented at the building level using the multi-carrier energy hub concept, which has recently gained popularity. This paper presents a technical and financial feasibility study of a building-integrated multi-carrier energy hub concept. The case study is performed for an existing large medical centre, where demand occurs simultaneously for electricity, cold, and heat at different temperature levels, including hot process water and steam. The central idea is to replace the high-exergy steam with heat from the municipal district heating network. The concept also includes the integration of heating and cooling loads, heat storage and implementation of an on-site photovoltaic (PV) power plant. The key components of the proposed hub technological structure are high-temperature heat pumps. Five alternative structures of the system configuration are examined using an hour-by-hour annual simulation. The results reveal that the proposed multi-carrier energy hub is fully operational. The project is also profitable, which results mainly from significant energy savings compared to the existing heat supply system using high-pressure steam. However, the profitability strongly depends on the system configuration, and the choice of the best option is ambiguous. The system with heat storage reaches the highest net present value (NPV) while the one without the storage results in the highest internal rate of return (IRR) due to significantly lower capital expenditures (CAPEX). In all cases, the project leads to a considerable cumulative CO2 emissions reduction, which is at the level of 1351 up to 2961 tons annually depending on system configuration.
| Original language | English |
|---|---|
| Article number | 129882 |
| Journal | Energy |
| Volume | 288 |
| DOIs | |
| Publication status | Published - 1 Feb 2024 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
-
SDG 13 Climate Action
Keywords
- District heating
- Energy management
- Energy planning
- Energy storage
- Energy systems
- Heat pumps
ASJC Scopus subject areas
- Civil and Structural Engineering
- Building and Construction
- Modeling and Simulation
- Renewable Energy, Sustainability and the Environment
- Fuel Technology
- Energy Engineering and Power Technology
- Pollution
- Mechanical Engineering
- General Energy
- Industrial and Manufacturing Engineering
- Management, Monitoring, Policy and Law
- Electrical and Electronic Engineering
Fingerprint
Dive into the research topics of 'Technical and economic analysis of a multicarrier building energy hub concept with heating loads at different temperature levels'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver