Abstract
Some problems have been discussed, connected with performing predictions of post-mining terrain deformations. Especially problems occur with the summation of horizontal strain over long time intervals as well as predictions of linear discontinuous deformations. Of great importance in recent years is the problem of taking into account transient values of deformations associated with the development of extraction field. The exemplary analysis has been presented of planned extraction influences on two characteristic locations of building structure. The proposal has been shown of calculations with using transient deformation model allowing to describe the influence of extraction advance influence on the value of coefficient of extraction rate c (time factor), according to own original empirical formula.
| Original language | English |
|---|---|
| Article number | 01008 |
| Journal | E3S Web of Conferences |
| Volume | 36 |
| DOIs | |
| Publication status | Published - 9 Apr 2018 |
| Event | 4th Nationwide Scientific Conference on Engineering-Infrastructure-Mining, BIG 2018 - Krakow, Poland Duration: 11 Jan 2018 → 12 Jan 2018 |
Keywords
- Post-mining deformations
- Transient deformation state
ASJC Scopus subject areas
- General Environmental Science
- General Energy
- General Earth and Planetary Sciences
Fingerprint
Dive into the research topics of 'Some aspects of forecasting the post-mining substratum deformation for evaluation of its influence on constructions'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver