Skip to main navigation Skip to search Skip to main content

Shrink connection modelling of the steam turbine rotor

  • PRUE (Power Engineering Equipment Overhaul Company)

Research output: Contribution to journalArticlepeer-review

23 Citations (Scopus)

Abstract

The paper analyzes the causes of improper operation of the interference connection between two members of the 34. MW turbine rotor. Diagnostic signals, especially in the form of vibrations arising at some operation stages of the machine, pointed to a possible malfunction of the interference connection. After dismantling, a visual inspection and material testing confirmed these predictions. Numerical thermal and strength simulations of the rotor operation showed a loss of the capacity to transfer load on part of the interference connection between the rotor components in some phases of the turbine start-up. The repair involved an increase in values of interference stress and an additional protection in the form of a circumferential weld between the linked parts of the rotor, which removed the problem and ensured a further safe and reliable operation of the turbine under analysis.

Original languageEnglish
Pages (from-to)217-227
Number of pages11
JournalEngineering Failure Analysis
Volume34
DOIs
Publication statusPublished - Dec 2013

Keywords

  • Contact stress
  • Rotor
  • Shrink connection
  • Steam turbine

ASJC Scopus subject areas

  • General Materials Science
  • General Engineering

Fingerprint

Dive into the research topics of 'Shrink connection modelling of the steam turbine rotor'. Together they form a unique fingerprint.

Cite this