Abstract
The paper presents the problem of scheduling in flexible manufacturing systems with additional resources consideration. In the developed model, the basic resources e.g. and additional resources - staff, tools, etc. - are assigned to resource groups. The allocation of operations to particular resources is carried out through these groups - by indicating the number of resources needed from a given group. At the scheduling stage, depending on the expected values of beginning and ending of the operation, the most advantageous resource for allocation is selected. Forward and backward scheduling strategies and serial and parallel schedule generation schemes are discussed in this context.
| Original language | English |
|---|---|
| Article number | 062016 |
| Journal | IOP Conference Series: Materials Science and Engineering |
| Volume | 400 |
| Issue number | 6 |
| DOIs | |
| Publication status | Published - 20 Sept 2018 |
| Event | 6th International Conference on Modern Technologies in Industrial Engineering, ModTech 2018 - Constanta, Romania Duration: 13 Jun 2018 → 16 Jun 2018 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
ASJC Scopus subject areas
- General Materials Science
- General Engineering
Fingerprint
Dive into the research topics of 'Schedule generation schemes for flexible manufacturing systems with additional resources'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver