Skip to main navigation Skip to search Skip to main content

Robust scheduling, a production scheduling model of failures

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

18 Citations (Scopus)

Abstract

In the paper a production model with failures is presented where successive failure-free times are supposed to have normal distributions and are followed by normally distributed times of repairs. Unknown parameters of the distribution are estimated using e.g. empirical moments approach. Predictions of unknown parameters are done using classical regression method. Having Mean Time To First Failure, and Mean Time of Repair a disturbance robust predictive schedule is generated using an immune algorithm and rule Minimal Impact of Disturbed Operation on the Schedule.

Original languageEnglish
Title of host publicationMechatronics and Computational Mechanics
Pages443-446
Number of pages4
DOIs
Publication statusPublished - 2013
Event2012 International Conference on Mechatronics and Computational Mechanics, ICMCM 2012 - Dubai, United Arab Emirates
Duration: 20 Dec 201221 Dec 2012

Publication series

NameApplied Mechanics and Materials
Volume307
ISSN (Print)1660-9336
ISSN (Electronic)1662-7482

Conference

Conference2012 International Conference on Mechatronics and Computational Mechanics, ICMCM 2012
Country/TerritoryUnited Arab Emirates
CityDubai
Period20/12/1221/12/12

Keywords

  • Immune algorithm
  • Mean time to first failure (mttff)
  • Multiobjective scheduling
  • Normal distribution
  • Predictive scheduling
  • Robust schedule

ASJC Scopus subject areas

  • General Engineering

Fingerprint

Dive into the research topics of 'Robust scheduling, a production scheduling model of failures'. Together they form a unique fingerprint.

Cite this