Abstract
The aim of the work was to develop a prioritizing and scheduling method to be followed in small and medium-sized companies operating under conditions of non-rhythmic and non-repeatable production. A system in which make to stock, make to order and engineer to order (MTS, MTO and ETO) tasks are carried out concurrently, referred to as a non-homogenous system, has been considered. Particular types of tasks have different priority indicators. Processes involved in the implementation of these tasks are dependent processes, which compete for access to resources. The work is based on the assumption that the developed procedure should be a universal tool that can be easily used by planners. It should also eliminate the intuitive manner of prioritizing tasks while providing a fast and easy to calculate way of obtaining an answer, i.e. a ready plan or schedule. As orders enter the system on an ongoing basis, the created plan and schedule should enable fast analysis of the result and make it possible to implement subsequent orders appearing in the system. The investigations were based on data from the non-homogenous production system functioning at the Experimental Plant of the Łukasiewicz Research Network – Institute of Ceramics and Building Materials, Refractory Materials Division – ICIMB. The developed procedure includes the following steps: 1 – Initial estimation of resource availability, 2 – MTS tasks planning, 3 – Production system capacity analysis, 4 – ETO tasks planning, 5 – MTO orders planning, 6 – Evaluation of the obtained schedule. The scheduling procedure is supported by KbRS (Knowledge-based Rescheduling System), which has been modified in functional terms for the needs of this work assumption.
| Original language | English |
|---|---|
| Pages (from-to) | 62-75 |
| Number of pages | 14 |
| Journal | Management and Production Engineering Review |
| Volume | 13 |
| Issue number | 1 |
| DOIs | |
| Publication status | Published - 1 Mar 2022 |
Keywords
- Job and activity scheduling
- Non-homogenous systems
- Procedures for process planning
- Production planning
- Production planning and control
- Scheduling
ASJC Scopus subject areas
- Business and International Management
- Management Science and Operations Research
- Organizational Behavior and Human Resource Management
- Industrial and Manufacturing Engineering
- Management of Technology and Innovation
Fingerprint
Dive into the research topics of 'Prioritizing and Scheduling of Production Orders in Non-homogenous Production Systems'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver