Abstract
The reconstruction of the railway traffic control devices led to the optimization of the coal removal process by reducing the number of errors generated by employees. There has been a considerable improvement in safety and a reducing the costs of traffic management and maintenance of railway infrastructure. The change of railway traffic control devices from relay to computer ones contributed toward improving control over the status of railway traffic devices and emergency states by obtaining information in the real state. The system enables the entering commands into the system and controls whether these commands are formally correct at the same time.
| Translated title of the contribution | OPTIMIZATION OF COAL REMOVAL PROCESS THROUGH RECONSTRUCTION OF RAILWAY TRAFFIC CONTROL DEVICES-CASE STUDY |
|---|---|
| Original language | Polish |
| Pages (from-to) | 52-57 |
| Number of pages | 6 |
| Journal | Rynek Energii |
| Volume | 167 |
| Issue number | 4 |
| Publication status | Published - 2023 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
ASJC Scopus subject areas
- General Mathematics
- General Energy
Fingerprint
Dive into the research topics of 'OPTIMIZATION OF COAL REMOVAL PROCESS THROUGH RECONSTRUCTION OF RAILWAY TRAFFIC CONTROL DEVICES-CASE STUDY'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver