TY - GEN
T1 - New Methods of an Assessment of the Integrated Performance Indicator
AU - Kozyra, Paweł M.
N1 - Publisher Copyright:
© 2023 IEEE.
PY - 2023
Y1 - 2023
N2 - Many real-world systems can be modeled by multi-state flow networks (MFNs) and their reliability evaluation features in designing and control of these systems. Considering the maintenance cost constraint makes the problem of reliability evaluation of an MFN more realistic. The maintenance cost associated with an MFN is the total cost of recovering the network from its current state back to its largest state. For a given demand level d and a maintenance budget limit b, the integrated performance indicator at level (d, b) is defined as the probability of transmitting at least d units of flow from the source node s to the sink node t and satisfying the maintenance budget limit b. It is shown, that the integrated performance indicator at level (d, b) can be computed using either actual (d, b)-MPs or (d - 1, b)-MCs and minimal elements of the set of all capacity vectors for which associated maintenance cost does not exceed the maintenance budget limit b. Moreover, efficient algorithms for determining these extreme capacity vectors of three types are presented.
AB - Many real-world systems can be modeled by multi-state flow networks (MFNs) and their reliability evaluation features in designing and control of these systems. Considering the maintenance cost constraint makes the problem of reliability evaluation of an MFN more realistic. The maintenance cost associated with an MFN is the total cost of recovering the network from its current state back to its largest state. For a given demand level d and a maintenance budget limit b, the integrated performance indicator at level (d, b) is defined as the probability of transmitting at least d units of flow from the source node s to the sink node t and satisfying the maintenance budget limit b. It is shown, that the integrated performance indicator at level (d, b) can be computed using either actual (d, b)-MPs or (d - 1, b)-MCs and minimal elements of the set of all capacity vectors for which associated maintenance cost does not exceed the maintenance budget limit b. Moreover, efficient algorithms for determining these extreme capacity vectors of three types are presented.
KW - (d, b)-MC
KW - actual (d, b)-MP
KW - integrated performance indicator
KW - maintenance budget constraints
KW - multi-state flow network (MFN)
UR - https://www.scopus.com/pages/publications/85183466536
U2 - 10.1109/ICSRS59833.2023.10381212
DO - 10.1109/ICSRS59833.2023.10381212
M3 - Conference contribution
AN - SCOPUS:85183466536
T3 - 2023 7th International Conference on System Reliability and Safety, ICSRS 2023
SP - 598
EP - 607
BT - 2023 7th International Conference on System Reliability and Safety, ICSRS 2023
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 7th International Conference on System Reliability and Safety, ICSRS 2023
Y2 - 22 November 2023 through 24 November 2023
ER -