Skip to main navigation Skip to search Skip to main content

New Methods of an Assessment of the Integrated Performance Indicator

Research output: Chapter in Book/Report/Conference proceeding › Conference contribution › peer-review

1 Citation (Scopus)

Abstract

Many real-world systems can be modeled by multi-state flow networks (MFNs) and their reliability evaluation features in designing and control of these systems. Considering the maintenance cost constraint makes the problem of reliability evaluation of an MFN more realistic. The maintenance cost associated with an MFN is the total cost of recovering the network from its current state back to its largest state. For a given demand level d and a maintenance budget limit b, the integrated performance indicator at level (d, b) is defined as the probability of transmitting at least d units of flow from the source node s to the sink node t and satisfying the maintenance budget limit b. It is shown, that the integrated performance indicator at level (d, b) can be computed using either actual (d, b)-MPs or (d - 1, b)-MCs and minimal elements of the set of all capacity vectors for which associated maintenance cost does not exceed the maintenance budget limit b. Moreover, efficient algorithms for determining these extreme capacity vectors of three types are presented.

Original languageEnglish
Title of host publication2023 7th International Conference on System Reliability and Safety, ICSRS 2023
PublisherInstitute of Electrical and Electronics Engineers Inc.
Pages598-607
Number of pages10
ISBN (Electronic)9798350306057
DOIs
Publication statusPublished - 2023
Event7th International Conference on System Reliability and Safety, ICSRS 2023 - Bologna, Italy
Duration: 22 Nov 2023 → 24 Nov 2023

Publication series

Name2023 7th International Conference on System Reliability and Safety, ICSRS 2023

Conference

Conference7th International Conference on System Reliability and Safety, ICSRS 2023
Country/TerritoryItaly
CityBologna
Period22/11/23 → 24/11/23

Keywords

  • (d, b)-MC
  • actual (d, b)-MP
  • integrated performance indicator
  • maintenance budget constraints
  • multi-state flow network (MFN)

ASJC Scopus subject areas

  • Computer Science Applications
  • Statistics, Probability and Uncertainty
  • Media Technology

Fingerprint

Dive into the research topics of 'New Methods of an Assessment of the Integrated Performance Indicator'. Together they form a unique fingerprint.

Cite this