Abstract
A method for production planning in a repetitive manufacturing system which allows for estimating the possibility of processing work orders in due time is presented. The difference between two approaches are presented; the first one one-piece flow elaborated in Toyota and the second one elaborated by authors that consists in defining sufficient conditions to filter all solutions and providing a set of admissible solutions for both the client and the producer. In the paper attention is focused on the buffer allocation. Illustrative examples are presented..
| Original language | English |
|---|---|
| Article number | 012133 |
| Journal | IOP Conference Series: Materials Science and Engineering |
| Volume | 95 |
| Issue number | 1 |
| DOIs | |
| Publication status | Published - 3 Nov 2015 |
| Event | 3rd Modern Technologies in Industrial Engineering, ModTech 2015 - Mamaia, Romania Duration: 17 Jun 2015 → 20 Jun 2015 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
ASJC Scopus subject areas
- General Materials Science
- General Engineering
Fingerprint
Dive into the research topics of 'Multi-assortment rhythmic production planning and control'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver