TY - GEN
T1 - Monitoring of highway bridges in areas under mining exploitation influence
AU - Salamak, M.
AU - Weseli, J.
AU - Radziecki, A.
PY - 2007
Y1 - 2007
N2 - The construction of a highway in the Silesian urban agglomeration, in the operation area of a number of coal mines, is a specific task. This is mainly because of the need to take into account in the design of the highway, bridges and all of accompanying facilities the necessity of protection against strong ground surface deformation. The safe use of highway bridges necessitates constant monitoring of their condition. Although monitoring is usually performed during the use of the bridge, it sometimes has to be implemented at an earlier stage. The situation that occurred during the construction of the Silesian segment of the A4 motorway may be defined as "interaction of highway construction with mining operations". Monitoring was performed in accordance with a programme developed earlier. That programme included indication of the type of measurements to be taken at each individual structure with the marking and arrangement of control points. The scope of observation was gradually expanded as construction operations proceeded.
AB - The construction of a highway in the Silesian urban agglomeration, in the operation area of a number of coal mines, is a specific task. This is mainly because of the need to take into account in the design of the highway, bridges and all of accompanying facilities the necessity of protection against strong ground surface deformation. The safe use of highway bridges necessitates constant monitoring of their condition. Although monitoring is usually performed during the use of the bridge, it sometimes has to be implemented at an earlier stage. The situation that occurred during the construction of the Silesian segment of the A4 motorway may be defined as "interaction of highway construction with mining operations". Monitoring was performed in accordance with a programme developed earlier. That programme included indication of the type of measurements to be taken at each individual structure with the marking and arrangement of control points. The scope of observation was gradually expanded as construction operations proceeded.
UR - https://www.scopus.com/pages/publications/52649090308
U2 - 10.1680/bdcam.35935.0051
DO - 10.1680/bdcam.35935.0051
M3 - Conference contribution
AN - SCOPUS:52649090308
SN - 9780727735935
T3 - Bridge Design, Construction and Maintenance - Proceedings of the two-day International Conference organised by the Institution of Civil Engineers, ICE
SP - 469
EP - 478
BT - Bridge Design, Construction and Maintenance - Proceedings of the two-day International Conference organised by the Institution of Civil Engineers, ICE
PB - Unavailable
T2 - 5th International Conference on Current and Future Trends in Bridge Design, Construction and Maintenance
Y2 - 17 September 2007 through 18 September 2007
ER -