Skip to main navigation Skip to search Skip to main content

Maintenance planning of power plant elements based on avoided risk value

  • Silesian University of Technology

Research output: Contribution to journal › Article › peer-review

13 Citations (Scopus)

Abstract

In the world's power sector, a large number of operating coal-fired power units are characterized by a relatively long service life. These power units often constitute the basic source of energy in individual national electric power systems; this implies that their reliability affects the reliability of the entire system of a given country. Therefore, the assessment of the current technical state of the power unit elements and of the risk related to their further operation is an issue of considerable importance. In this paper, we present an analysis of the assessment of the probability of the failure of steam piping being a critical element of the power unit. Theoretical calculations of the probability of failure are presented and a method for its estimation using non-destructive testing of the steel metallographic microstructure is proposed. Further, a rational estimation method of the optimal time to replace the steam pipelines is proposed on the basis of the avoided risk value and the modified net present value index of the discounted cash flows related to the risk.

Original languageEnglish
Pages (from-to)672-680
Number of pages9
JournalEnergy
Volume134
DOIs
Publication statusPublished - 2017

Keywords

  • Creep
  • Maintenance planning
  • Risk
  • Steam piping

ASJC Scopus subject areas

  • Civil and Structural Engineering
  • Building and Construction
  • Modeling and Simulation
  • Renewable Energy, Sustainability and the Environment
  • Fuel Technology
  • Energy Engineering and Power Technology
  • Pollution
  • General Energy
  • Mechanical Engineering
  • Industrial and Manufacturing Engineering
  • Management, Monitoring, Policy and Law
  • Electrical and Electronic Engineering

Fingerprint

Dive into the research topics of 'Maintenance planning of power plant elements based on avoided risk value'. Together they form a unique fingerprint.

Cite this