Load Test of Railway Viaduct Built Using Crosswise Launching Technology

Research output: Contribution to journalConference articlepeer-review

7 Citations (Scopus)

Abstract

The railway viaduct WK-3 built using crosswise launching technology under the task .,Trasa GóRNA" in Łódź. Testing program was prepared in two stages due to the railway line closure for 68 hours. Due to it, rigidity of the load carrying structures could have been controlled at selected stages of the construction. Load tests made us evaluate theoretical computational model and confirm design capacity.

Original languageEnglish
Pages (from-to)530-537
Number of pages8
JournalProcedia Engineering
Volume161
DOIs
Publication statusPublished - 2016
EventWorld Multidisciplinary Civil Engineering-Architecture-Urban Planning Symposium, WMCAUS 2016 - Prague, Czech Republic
Duration: 13 Jun 201617 Jun 2016

Keywords

  • crosswise launching technology
  • load test
  • modelling
  • railway bridge