Abstract
The article presents the application of the MBB (Moving Block Bootstrap) method for short-term load forecasting of public utility facilities. The forecasts are intended to support the selection of strategies for optimizing electricity consumption. The study was conducted under real, everyday operating conditions using two types of buildings typical for municipalities: swimming pools and office buildings. The analysis also took into account additional power quality parameters, such as the power factor.
| Translated title of the contribution | Prognozowanie obciążenia z uwzględnieniem parametrów jakości energii elektrycznej i metody Moving Block Bootstrap |
|---|---|
| Original language | English |
| Pages (from-to) | 158-165 |
| Number of pages | 8 |
| Journal | Przeglad Elektrotechniczny |
| Volume | 102 |
| Issue number | 7 |
| DOIs | |
| Publication status | Published - 2026 |
Keywords
- energy efficiency
- load forecasting
- optimization of electricity consumption
- power quality
ASJC Scopus subject areas
- Electrical and Electronic Engineering
Fingerprint
Dive into the research topics of 'Forecasting electrical load based on power quality parameters and the Moving Block Bootstrap'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver