Abstract
A queuing system of the M/M/1/N type with cyclic failure-free and repair times and cyclic defective production is used as a model of a single machine production system. Production tasks arrive according to an exponential process and are served with normally disturbed processing time. Successive working (failure-free) times, repair times and defect-free production have exponential distributions. Defective products can be recirculated and back to the production line according to a Bernoulli distributions. The objective is to evaluate effectiveness of the production system using Overall Equipment Effectiveness before and after introducing improvement initiatives..
| Original language | English |
|---|---|
| Article number | 012155 |
| Journal | IOP Conference Series: Materials Science and Engineering |
| Volume | 95 |
| Issue number | 1 |
| DOIs | |
| Publication status | Published - 3 Nov 2015 |
| Event | 3rd Modern Technologies in Industrial Engineering, ModTech 2015 - Mamaia, Romania Duration: 17 Jun 2015 → 20 Jun 2015 |
ASJC Scopus subject areas
- General Materials Science
- General Engineering
Fingerprint
Dive into the research topics of 'Estimation of overall equipment effectiveness using simulation programme'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver