TY - GEN
T1 - Concurrent Planning and Scheduling of Heterogeneous Production System. Case Study
AU - Skołud, Bożena
AU - Szopa, Agnieszka
AU - Kalinowski, Krzysztof
N1 - Publisher Copyright:
© 2020, Springer Nature Switzerland AG.
PY - 2020
Y1 - 2020
N2 - The problem of heterogeneous production planning and scheduling is presented in this paper. The basic assumption of the study is the “methodology of the practice”, i.e. simple, fast and flexible, enabling to determine whether the given order can be implemented in the system on the basis of meeting or not specified conditions. The case study presented scheduling of the production of refractory materials with KbRS software is presented.
AB - The problem of heterogeneous production planning and scheduling is presented in this paper. The basic assumption of the study is the “methodology of the practice”, i.e. simple, fast and flexible, enabling to determine whether the given order can be implemented in the system on the basis of meeting or not specified conditions. The case study presented scheduling of the production of refractory materials with KbRS software is presented.
KW - Heterogeneous production systems
KW - Production planning
KW - Scheduling
UR - https://www.scopus.com/pages/publications/85065901615
U2 - 10.1007/978-3-030-20055-8_35
DO - 10.1007/978-3-030-20055-8_35
M3 - Conference contribution
AN - SCOPUS:85065901615
SN - 9783030200541
T3 - Advances in Intelligent Systems and Computing
SP - 366
EP - 375
BT - 14th International Conference on Soft Computing Models in Industrial and Environmental Applications SOCO 2019, Proceedings
A2 - Quintián, Héctor
A2 - Martínez Álvarez, Francisco
A2 - Troncoso Lora, Alicia
A2 - Sáez Muñoz, José António
A2 - Corchado, Emilio
PB - Springer Verlag
T2 - 14th International Conference on Soft Computing Models in Industrial and Environmental Applications, SOCO 2019
Y2 - 13 May 2019 through 15 May 2019
ER -