Skip to main navigation Skip to search Skip to main content

Ant colony optimization in project management

  • Silesian University of Technology

Research output: Contribution to journal › Article › peer-review

Abstract

This paper presents an Ant Colony Optimization (ACO) approach to the resource-constrained project scheduling problem (RCPSP). RCPSP as a generalization of the classical job shop scheduling problem belongs to the class of NP-hard optimization problems. Therefore, the use of heuristic solution procedures when solving large problem is well-founded. Most of the heuristic methods used for solving resourceconstrained project scheduling problems either belong to the class of priority rule based methods or to the class of metaheuristic based approaches. ACO is a metaheuristic method in which artificial ants build solutions by probabilistic selecting from problem-specific solutions components influenced by a parametrized model of solution, called pheromone model. In ACO several generations of artificial ants search for good solution. Every ant builds a solution step by step going through several probabilistic decisions. If ant find a good solution mark their paths by putting some amount of pheromone (which is guided by some problem specific heuristic) on the edges of the path.

Original languageEnglish
Pages (from-to)745-752
Number of pages8
JournalComputer Assisted Mechanics and Engineering Sciences
Volume14
Issue number4
Publication statusPublished - 2007

Keywords

  • Ant colony optimization
  • Multi-project scheduling
  • Project scheduling
  • Resources constrained scheduling problem
  • Swarm intelligence

ASJC Scopus subject areas

  • Computational Mechanics
  • Mechanical Engineering
  • Computer Science Applications

Fingerprint

Dive into the research topics of 'Ant colony optimization in project management'. Together they form a unique fingerprint.

Cite this