Abstract
The original contribution of the paper is the consideration a flow shop system with setup and closedown times of a critical machine. In addition, the critical machine suffers from random failures. In the paper various concepts of increasing throughput by adjusting the bottleneck buffer by a rope and controlling speed of production by a drum are presented according to the Drum-Buffer-Rope (DBR) concept. Various capacities of the machine tied to the rope are given. The case of the production process that must be suspended when the buffer reaches the limit, should be avoided. Similarly, the case of the production process which a machine is not effectively used and needs to be stopped, is not desirable. The objective of the paper is to analyze the impact of the burstiness of input data on the DBR system performance. A sufficient size of the constraint buffer to protect the bottleneck against processing time variations and system disturbances is established.
| Original language | English |
|---|---|
| Pages (from-to) | 128-136 |
| Number of pages | 9 |
| Journal | International Journal of Modern Manufacturing Technologies |
| Volume | 11 |
| Issue number | 3 Special Issue |
| Publication status | Published - 2019 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
Keywords
- Bottleneck
- Critical machine
- Drum-Buffer-Rope
- Flow shop
- Managing buffers
- Theory of Constraints
ASJC Scopus subject areas
- Industrial and Manufacturing Engineering
Fingerprint
Dive into the research topics of 'Analysis of queue-size behaviour and throughput of a system with buffer controlled by a rope and production speed controlled by a drum'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver