Abstract

In the paper, a production model with maintenance is presented. Successive failure-free times of a bottleneck are supposed to have predefined distributions and are followed by distributed times of repair. Having values of parameters: mean time to failure and mean time of repair, a predictive schedule is generated. To assess wastes due to unplanned events of the bottleneck, such as unplanned downtime the overall equipment effectiveness indicator is applied. To assess failure rate of the bottleneck the parts per million opportunities indicator is applied. Prediction capability, detection capability of a failure and effects of the failure occurrence are evaluated and registered in the exploitation failure mode and effects analysis form. The objective of the presented predictive scheduling model is to achieve: zero machine’s failures, zero defects, zero accidents at work.

Original languageEnglish
Title of host publicationModern Technologies in Industrial Engineering II
EditorsAlexander Mikhaylov, Dumitru Nedelcu, Alexei Toca, Andrzej Wrobel, Constantin Carausu, Emil Oanta
PublisherTrans Tech Publications Ltd.
Pages885-890
Number of pages6
ISBN (Electronic)9783038352556
DOIs
Publication statusPublished - 2014

Publication series

NameAdvanced Materials Research
Volume1036
ISSN (Print)1022-6680
ISSN (Electronic)1662-8985

Keywords

  • Failure mode and effects analysis
  • Maintenance scheduling
  • Mean time to failure
  • Overall equipment effectiveness
  • Predictive scheduling
  • Reliability function

ASJC Scopus subject areas

  • General Engineering

Fingerprint

Dive into the research topics of 'A production scheduling model with maintenance'. Together they form a unique fingerprint.

Cite this